lightweight building materials retaining wall build concrete

FOB Reference Price:Get Latest Price
$10.15 - $14.85 / Square Meter | 100 Square Meter/Square Meters (Min. Order)
Type:
EPS Sandwich Panels
Lead Time:
Quantity(Square Meters) 1 - 1000 >1000
Est. Time(days) 7 Negotiable
Customization:
Customized logo (Min. Order: 2000 Square Meters)
Customized packaging (Min. Order: 2000 Square Meters)

More

Graphic customization (Min. Order: 2000 Square Meters) Less
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Fujian, China
Brand Name:
ZJT
Model Number:
ZJTFP
Panel Material:
Nonmetal
Facing panel:
fiber cement board/Calcium Silicate board
Core Material:
Cement,EPS and Sand,Fly ash
Certificate:
CE,ISO,SGS
Specification:
various and customized
Light weight:
1 person can take up two pieces
Application:
wall/roof/floor
Installation speed:
15sqm/person/day
Fireproof Limit:
>3Hours
Anti-pressure:
>3.5Mpa
Service:
best after-sale service
Supply Ability
Supply Ability:
200000 Square Meter/Square Meters per Month retaining wall build concrete
Packaging & Delivery
Packaging Details
1.Free packing (with normal pallet and packing belt) 2.Standard exporting packing (wrapped with plastic thin film,edge protect and good pallet): USD20-30/Package 3.Packing size: 1500-3000*610*1000mm 4.Loading: 18 pallets per 20' container, 11000kgs-18000kgs per 20' container
Port
Xiamen
Lead Time :
Quantity(Square Meters) 1 - 1000 >1000
Est. Time(days) 7 To be negotiated
Video Description

 

Product Description

ZJT Light Composite Energy-saving Sandwich Wall is  is a light weight interlocking sandwich panel. It uses to facings of 5mm thick fibre-cement sheet with a low density concrete core consisting of a mix of portland cement, Silicaceous and Micaceous aggregate.

 

 

 

Installation Process

EPS Cement Wall Panels Installation Process

(1). Alignment, transportation of materials

In the installation position of the shell wall plate, the beam is placed vertically to ensure the installation of wall panels is aligned. A 1.5 square meter board can be carried freely by 2 people.

 

(2). Sawing of panels

According to the requirements of mobile machines with an arbitrary cut, adjust the width and length of the wall so that the risk of damage is minimized.


(3). Sizing

Using a specific proportion of slurry and water to turn into a paste, use water to even up the bumps. After that, apply polymer mortar in the grooves in the wall and in the baseline of the wall.

 

(4). Fitting the sheet

After moving the mortar-covered wall panels to their respective positions, align them vertically with the baseline. Use the crowbar to ensure the wall panels are tightly fitted with one another.

 

 


(5). In place

Place the walls together closely so that excess mortar can be scraped away. Finally, temporarily fix the wall in place.

 

(6). Adjustments

Check the adjustments of the wall and make the necessary adjustments.

 

(7). Filling of joints

One day after the wall is set up, slurry will be used to fill in the gaps between panes.

 

(8). Installation of crack-resistant material

Three to five days after the joints are filled, crack-resistant materials will be pasted along the joints.

 

(9). Insertion of wires

An electric saw will be utilized for the creation of grooves in which switch boxes and wires can be implanted. Any gaps left behind can be filled with mortar.

(1o). Plastering of paint

To finish the wall, tiles may be fitted without any scraping. Wallpaper may also be applied directly onto the wall.


(11). Installation of door frame

Many types of door frames can be fitted in the wall. The plywood can be secure with nails and wall anchor.

 

(12). Fitting of door and window

Preparing a door and window hole on the installed wall, anchoraging it with splint or lines.

 

 

Why Choose ZJT panel
  • Rapid construction specifically designed for use in remote areas where less skilled labor.
  • Can be used for multi-storey buildings.
  • With ingredients that have been tested scientifically, helping audiepanel walls that can withstand earthquakes.
  • Much lighter than the other conventional bricks.
  • Without plastering and smoothing walls, these products only need one day to erect a wall measuring 50m² and in just half a day.
  • Workers can instantly paint the walls after the installation.
Advantages

 

Clients Visited